EQ Logic was responsible for Design, programming, commissioning of 3.8MVA power station and integration of the power station to the existing plant control system. The automation for power station was designed such that the power station is fully automated and will ramp the power availability up and down based up on the spinning reserve (Future) power requirement for the process plant. The result of this was Baldhill minesite that had frequent power black outs due to manually managing generators to stable power with minimal to none black out there by improving the production and reducing the plant downtime.